Concrete 50 MPa 30% fly ash, at batching plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete manufacturing process to produce ready-mix concrete at plant (raw material provision, raw material mixing, transportation, energy and plant use). No administration is included. Wastewater and some solid wastes are considered. No dust is accounted for. Doesn't include transporting concrete to site. Remark: The amount of cement is adopted as per GBCA Geography: Concrete batching plants in Australia Technology: The concrete production is based on ready-mix concrete production in Australia Record: Data entry by: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU Generator: Generator/publicator: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
c42501ea-f1c3-33e9-8ee6-8edc2a7a9d28

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Concrete 50 MPa 30% fly ash, at batching plant {AU}| | AusLCI, U
Sampling procedure
Average data for the Australian industry based on ecoinvent process
Creation date
27 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Green Building Council Australia (2012)

Product outputs

Flow AmountUnitComment
Concrete 50 MPa 30% fly ash, at batching plant {AU}| | AusLCI, U 1.0 m3 AUSTRALIA

Technical inputs

Flow AmountUnitComment
Concrete mixing factory {GLO}| market for concrete mixing factory | Cut-off, U 0.000000457 Item(s) (2,1,1,1,1,5); as ecoinvent process
Diesel, burned in building machine {GLO}| market for diesel, burned in building machine | Cut-off, U 22.7 MJ (2,1,1,2,1,5); as ecoinvent process
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 4.36 kWh (2,1,1,1,1,5); as ecoinvent process
Fly ash, delivered to plant {AU}| | AusLCI, U 216.00149999999996 kg —
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 1046.7857961269842 kg (4,1,1,3,1,5)
Ground granulated blast furnace slag, at cement plant {AU}| | AusLCI, U 0.0 kg —
Heat, district or industrial, other than natural gas {RoW}| heat production, heavy fuel oil, at industrial furnace 1MW | Cut-off, U 3.09 MJ (2,1,1,1,1,5); as ecoinvent process
Heat, district or industrial, other than natural gas {RoW}| heat production, light fuel oil, at industrial furnace 1MW | Cut-off, U 13.3 MJ (2,1,1,1,1,5); as ecoinvent process
Lubricating oil {RoW}| market for lubricating oil | Cut-off, U 0.0119 kg (2,1,1,2,1,5); as ecoinvent process
Melamine formaldehyde resin {RoW}| market for melamine formaldehyde resin | Cut-off, U 6.646199999999999 kg —
Natural gas, burned in tangential fired boiler {AU}| | AusLCI, U 1.16 MJ (2,1,1,2,1,5); as ecoinvent process
Ordinary portland cement, Australian average {AU}| | AusLCI, U 387.69499999999994 kg (1,1,1,1,1,5)
Recycled aggregate, at plant {AU}| | AusLCI, U 0.0 kg (4,1,1,3,1,5)
Sand {RoW}| market for sand | Cut-off, U 541.9748944444444 kg (4,1,1,3,1,5)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.0238 kg (2,1,1,2,1,5); as ecoinvent process
Synthetic rubber {GLO}| market for synthetic rubber | Cut-off, U 0.00713 kg (2,1,1,2,1,5); as ecoinvent process
Tap water, at user, Australia {AU}| | AusLCI, U 181.10894999999996 kg (4,1,1,3,1,5)
Transport, truck, 40t load {AU}| | AusLCI, U 52.70566483499365 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 27.288435935277775 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 83.07749999999999 t*km (2,1,1,2,1,5);

Outputs to treatment

Flow AmountUnitComment
Waste concrete {RoW}| treatment of waste concrete, inert material landfill | Cut-off, U 16.9 kg (2,1,1,1,1,5); as ecoinvent process
Waste treatment, inert waste, at landfill {AU}| | AusLCI, U 0.0951 kg (2,1,1,1,1,5); as ecoinvent process
Wastewater from concrete production {RoW}| market for wastewater from concrete production | Cut-off, U 0.0143 m3 (2,1,1,1,1,5); as ecoinvent process

Parameters

NameValueFormulaDescription
rep_rate 1.3 — Replacement factor for slag and fly ash
fr_waste 0.007 — fraction of waste generated at batching plant, as per ecoinvent
fr_admix 0.012 — % of admixtures by mass of cementitious material
m_gravel 1046.7857961269842 (vol_aggre*fr_gravel*sg_gravel*1000) kg
m_cement 387.69499999999994 m_cementitious*(1-(fr_slag+fr_flyash))*(1+fr_waste) —
km_cementitious 150.0 — from cement plant to concrete batching plant
tkm_sand 27.288435935277775 m_sand*km_sand/1000*(1+fr_waste) t-km
m_flyash 216.00149999999996 (fr_flyash*m_cementitious*rep_rate)*(1+fr_waste) kg
m_admix 6.646199999999999 (fr_admix*m_cementitious)*(1+fr_waste) kg
km_sand 50.0 — from quarry to concrete batching plant
vol_admix 0.0062699999999999995 m_admix/sg_admix/1000 cum
m_water 181.10894999999996 (m_cement+m_slag+m_flyash)*wc_ratio kg
sg_slag 2.9 — http://www.slagcement.org/Sustainability/pdf/No2_Proportioning.pdf
RecAggFrac — — Fraction of Aggregate which is from recycled sources.
fr_gravel 0.65 — fraction of aggreagte in total fine + coarse aggregate
m_sand 541.9748944444444 (vol_aggre*fr_sand*sg_sand*1000) kg
vol_flyash 0.07714339285714285 m_flyash/sg_flyash/1000 cum
vol_aggre 0.6193998793650793 (1+fr_waste)-(vol_cement+vol_water+vol_admix+vol_flyash+vol_slag) cum
sg_gravel 2.6 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
sg_water 1.0 — —
m_cementitious 550.0 — as per GBCA
wc_ratio 0.3 — water reuirement is assumed to be 5% less with use of SCM
vol_slag — m_slag/sg_slag/1000 cum
sg_cement 3.15 — http://www.engineeringcivil.com/theory/concrete-engineering/mix-design/page/3
m_concrete 2363.5508541874283 (m_cement+m_sand+m_gravel+m_flyash+m_slag+m_admix+m_water)*(1-fr_waste) kg; mass of net concrete
fr_slag — — % of cementitious material
sg_sand 2.5 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
sg_flyash 2.8 — http://www.boralna.com/flyash/faq.asp
sg_concrete 2363.5508541874283 m_concrete/1 kg/m3
vol_cement 0.12307777777777776 m_cement/sg_cement/1000 cum
tkm_gravel 52.70566483499365 m_gravel*km_gravel/1000*(1+fr_waste) t-km
sg_admix 1.06 — file:///C:/Users/Timothy/Downloads/MENT-ECO%203Re%20-%20665%20(2).pdf
tkm_cementitious 83.07749999999999 m_cementitious*km_cementitious/1000*(1+fr_waste) t-km
fr_flyash 0.3 — % of cementitious material
vol_water 0.18110894999999996 m_water/sg_water/1000 cum
m_slag — (fr_slag*m_cementitious*rep_rate)*(1+fr_waste) kg
km_gravel 50.0 — from quarry to concrete batching plant
fr_sand 0.35 — fraction of sand in total fine + coarse aggregate