Concrete 25 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete manufacturing process to produce ready-mix concrete at plant (raw material provision, raw material mixing, transportation, energy and plant use). No administration is included. Wastewater and some solid wastes are considered. No dust is accounted for. Doesn't include transporting concrete to site. Remark: The amount of cement is adopted as per GBCA Geography: Concrete batching plants in Australia Technology: The concrete production is based on ready-mix concrete production in Australia Record: Data entry by: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU Generator: Generator/publicator: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
afef9439-2726-39cd-85a9-23eafbe6045b

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Concrete 25 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U
Sampling procedure
Average data for the Australian industry based on ecoinvent process
Creation date
27 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Green Building Council Australia (2012)

Product outputs

Flow AmountUnitComment
Concrete 25 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U 1.0 m3 AUSTRALIA

Technical inputs

Flow AmountUnitComment
Concrete mixing factory {GLO}| market for concrete mixing factory | Cut-off, U 0.000000457 Item(s) (2,1,1,1,1,5); as ecoinvent process
Diesel, burned in building machine {GLO}| market for diesel, burned in building machine | Cut-off, U 22.7 MJ (2,1,1,2,1,5); as ecoinvent process
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 4.36 kWh (2,1,1,1,1,5); as ecoinvent process
Fly ash, delivered to plant {AU}| | AusLCI, U 0.0 kg —
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 1258.1343142801531 kg (4,1,1,3,1,5)
Ground granulated blast furnace slag, at cement plant {AU}| | AusLCI, U 121.74629999999999 kg —
Heat, district or industrial, other than natural gas {RoW}| heat production, heavy fuel oil, at industrial furnace 1MW | Cut-off, U 3.09 MJ (2,1,1,1,1,5); as ecoinvent process
Heat, district or industrial, other than natural gas {RoW}| heat production, light fuel oil, at industrial furnace 1MW | Cut-off, U 13.3 MJ (2,1,1,1,1,5); as ecoinvent process
Lubricating oil {RoW}| market for lubricating oil | Cut-off, U 0.0119 kg (2,1,1,2,1,5); as ecoinvent process
Melamine formaldehyde resin {RoW}| market for melamine formaldehyde resin | Cut-off, U 1.5608499999999998 kg —
Natural gas, burned in tangential fired boiler {AU}| | AusLCI, U 1.16 MJ (2,1,1,2,1,5); as ecoinvent process
Ordinary portland cement, Australian average {AU}| | AusLCI, U 218.51899999999998 kg (1,1,1,1,1,5)
Recycled aggregate, at plant {AU}| | AusLCI, U 0.0 kg (4,1,1,3,1,5)
Sand {RoW}| market for sand | Cut-off, U 651.4009023639845 kg (4,1,1,3,1,5)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.0238 kg (2,1,1,2,1,5); as ecoinvent process
Synthetic rubber {GLO}| market for synthetic rubber | Cut-off, U 0.00713 kg (2,1,1,2,1,5); as ecoinvent process
Tap water, at user, Australia {AU}| | AusLCI, U 149.71673199999998 kg (4,1,1,3,1,5)
Transport, truck, 40t load {AU}| | AusLCI, U 46.8255 t*km (2,1,1,2,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 63.34706272400571 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 32.798035434026616 t*km (2,1,1,1,1,5);

Outputs to treatment

Flow AmountUnitComment
Waste concrete {RoW}| treatment of waste concrete, inert material landfill | Cut-off, U 16.9 kg (2,1,1,1,1,5); as ecoinvent process
Waste treatment, inert waste, at landfill {AU}| | AusLCI, U 0.0951 kg (2,1,1,1,1,5); as ecoinvent process
Wastewater from concrete production {RoW}| market for wastewater from concrete production | Cut-off, U 0.0143 m3 (2,1,1,1,1,5); as ecoinvent process

Parameters

NameValueFormulaDescription
m_admix 1.5608499999999998 (fr_admix*m_cementitious)*(1+fr_waste) kg
sg_gravel 2.6 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
m_slag 121.74629999999999 (fr_slag*m_cementitious*rep_rate)*(1+fr_waste) kg
RecAggFrac — — Fraction of Aggregate which is from recycled sources.
fr_admix 0.005 — % of admixtures by mass of cementitious material
sg_admix 1.06 — file:///C:/Users/Timothy/Downloads/MENT-ECO%203Re%20-%20665%20(2).pdf
m_water 149.71673199999998 (m_cement+m_slag+m_flyash)*wc_ratio kg
fr_flyash — — % of cementitious material
km_cementitious 150.0 — from cement plant to concrete batching plant
tkm_sand 32.798035434026616 m_sand*km_sand/1000*(1+fr_waste) t-km
rep_rate 1.3 — Replacement factor for slag and fly ash
vol_cement 0.0693711111111111 m_cement/sg_cement/1000 cum
m_gravel 1258.1343142801531 (vol_aggre*fr_gravel*sg_gravel*1000) kg
vol_flyash — m_flyash/sg_flyash/1000 cum
tkm_gravel 63.34706272400571 m_gravel*km_gravel/1000*(1+fr_waste) t-km
wc_ratio 0.44 — water reuirement is assumed to be 5% less with use of SCM
fr_slag 0.3 — % of cementitious material
m_sand 651.4009023639845 (vol_aggre*fr_sand*sg_sand*1000) kg
sg_sand 2.5 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
m_flyash — (fr_flyash*m_cementitious*rep_rate)*(1+fr_waste) kg
sg_flyash 2.8 — http://www.boralna.com/flyash/faq.asp
sg_concrete 2384.2705519536285 m_concrete/1 kg/m3
vol_admix 0.0014724999999999996 m_admix/sg_admix/1000 cum
sg_cement 3.15 — http://www.engineeringcivil.com/theory/concrete-engineering/mix-design/page/3
vol_slag 0.04198148275862069 m_slag/sg_slag/1000 cum
m_concrete 2384.2705519536285 (m_cement+m_sand+m_gravel+m_flyash+m_slag+m_admix+m_water)*(1-fr_waste) kg; mass of net concrete
fr_sand 0.35 — fraction of sand in total fine + coarse aggregate
km_sand 50.0 — from quarry to concrete batching plant
vol_water 0.149716732 m_water/sg_water/1000 cum
tkm_cementitious 46.8255 m_cementitious*km_cementitious/1000*(1+fr_waste) t-km
m_cementitious 310.0 — as per GBCA
vol_aggre 0.744458174130268 (1+fr_waste)-(vol_cement+vol_water+vol_admix+vol_flyash+vol_slag) cum
fr_waste 0.007 — fraction of waste generated at batching plant, as per ecoinvent
sg_water 1.0 — —
fr_gravel 0.65 — fraction of aggreagte in total fine + coarse aggregate
km_gravel 50.0 — from quarry to concrete batching plant
m_cement 218.51899999999998 m_cementitious*(1-(fr_slag+fr_flyash))*(1+fr_waste) —
sg_slag 2.9 — http://www.slagcement.org/Sustainability/pdf/No2_Proportioning.pdf