General purpose cement, at plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete process to produce cement from clinker(raw material provision, raw material mixing, energy and plant use). Packaging is not included. Remark: The amount of raw materials is based on the Cement Industry Federation report. Geography: Cement plants in Australia Technology: The cement production is based on dry kiln technology in raw meal is heated in a kiln to form clinker. Cement is produced by grinding clinker with gypsum and limestone. Production volume: 8.6 MT in 2012-13 Record: Data entry by: Bharat Sharma Telephone: +61 394171190; E-mail: brett@lifecycles.com.au; Company: Life Cycle Strategies; Country: AU Generator: Data entry by: Bharat Sharma Telephone: +61 394171190; E-mail: brett@lifecycles.com.au; Company: Life Cycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
91450737-bc20-3755-9cd4-7d99da0ebc26

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
General purpose cement, at plant {AU}| | AusLCI, U
Sampling procedure
—
Creation date
20 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Cement Industry Federation

Product outputs

Flow AmountUnitComment
General purpose cement, at plant {AU}| | AusLCI, U 1.0 kg AUSTRALIA

Technical inputs

Flow AmountUnitComment
Cement factory {GLO}| market for cement factory | Cut-off, U 0.0000000000536 Item(s) (2,1,1,1,1,5);
Clinker, at plant {AU}| | AusLCI, U 0.9 kg (2,1,1,1,1,5);
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 0.03762 kWh (2,1,1,1,1,5);
Gypsum, mineral {RoW}| market for gypsum, mineral | Cut-off, U 0.05 kg —
Limestone, crushed, for mill {RoW}| market for limestone, crushed, for mill | Cut-off, U 0.05 kg —
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.00004 kg (2,1,1,2,1,5);

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
Heat, waste Emission to airunspecified 0.103 MJ (2,1,1,2,1,5);

Parameters

NameValueFormulaDescription
m_limestone 0.05 fr_limestone*1 —
fr_gypsum 0.05 — Assumed 5% gypsum. General purpose cement is a mix of clinker and gypsum with the optional addition of up to 5 per cent slag, fly ash and/or limestone. source: CIF
fr_limestone 0.05 — Assumed 5% limestone. General purpose cement is a mix of clinker and gypsum with the optional addition of up to 5 per cent slag, fly ash and/or limestone. source: CIF
fr_clinker 0.9 — Assumed 90% clinker. General purpose cement is a mix of clinker and gypsum with the optional addition of up to 5 per cent slag, fly ash and/or limestone. source: CIF
m_clinker 0.9 fr_clinker*1 —
fr_electricity 0.38 — (1,5,1,3,2,5); 38% of electrical energy is consumed in production of cement from clinker as per the study, A critical review on energy use and savings in the cement industry by Madlool and collegues.
m_gypsum 0.05 fr_gypsum*1 —
ED_electricity 0.03762 ED_electricitycement*fr_electricity/1000 —
ED_electricitycement 99.0 — 99 kwh/t of electrical energy is used in making cement