Concrete 40 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete manufacturing process to produce ready-mix concrete at plant (raw material provision, raw material mixing, transportation, energy and plant use). No administration is included. Wastewater and some solid wastes are considered. No dust is accounted for. Doesn't include transporting concrete to site. Remark: The amount of cement is adopted as per GBCA Geography: Concrete batching plants in Australia Technology: The concrete production is based on ready-mix concrete production in Australia Record: Data entry by: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU Generator: Generator/publicator: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
8b47af2f-1e21-3f38-8486-976cac55b2ef

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Concrete 40 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U
Sampling procedure
Average data for the Australian industry based on ecoinvent process
Creation date
27 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Green Building Council Australia (2012)

Product outputs

Flow AmountUnitComment
Concrete 40 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U 1.0 m3 AUSTRALIA

Technical inputs

Flow AmountUnitComment
Concrete mixing factory {GLO}| market for concrete mixing factory | Cut-off, U 0.000000457 Item(s) (2,1,1,1,1,5); as ecoinvent process
Diesel, burned in building machine {GLO}| market for diesel, burned in building machine | Cut-off, U 22.7 MJ (2,1,1,2,1,5); as ecoinvent process
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 4.36 kWh (2,1,1,1,1,5); as ecoinvent process
Fly ash, delivered to plant {AU}| | AusLCI, U 0.0 kg —
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 1136.6577749989274 kg (4,1,1,3,1,5)
Ground granulated blast furnace slag, at cement plant {AU}| | AusLCI, U 172.80119999999997 kg —
Heat, district or industrial, other than natural gas {RoW}| heat production, heavy fuel oil, at industrial furnace 1MW | Cut-off, U 3.09 MJ (2,1,1,1,1,5); as ecoinvent process
Heat, district or industrial, other than natural gas {RoW}| heat production, light fuel oil, at industrial furnace 1MW | Cut-off, U 13.3 MJ (2,1,1,1,1,5); as ecoinvent process
Lubricating oil {RoW}| market for lubricating oil | Cut-off, U 0.0119 kg (2,1,1,2,1,5); as ecoinvent process
Melamine formaldehyde resin {RoW}| market for melamine formaldehyde resin | Cut-off, U 2.65848 kg —
Natural gas, burned in tangential fired boiler {AU}| | AusLCI, U 1.16 MJ (2,1,1,2,1,5); as ecoinvent process
Ordinary portland cement, Australian average {AU}| | AusLCI, U 310.15599999999995 kg (1,1,1,1,1,5)
Recycled aggregate, at plant {AU}| | AusLCI, U 0.0 kg (4,1,1,3,1,5)
Sand {RoW}| market for sand | Cut-off, U 588.5062444521074 kg (4,1,1,3,1,5)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.0238 kg (2,1,1,2,1,5); as ecoinvent process
Synthetic rubber {GLO}| market for synthetic rubber | Cut-off, U 0.00713 kg (2,1,1,2,1,5); as ecoinvent process
Tap water, at user, Australia {AU}| | AusLCI, U 173.86459199999996 kg (4,1,1,3,1,5)
Transport, truck, 40t load {AU}| | AusLCI, U 66.46199999999999 t*km (2,1,1,2,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 29.631289408163603 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 57.23071897119599 t*km (2,1,1,1,1,5);

Outputs to treatment

Flow AmountUnitComment
Waste concrete {RoW}| treatment of waste concrete, inert material landfill | Cut-off, U 16.9 kg (2,1,1,1,1,5); as ecoinvent process
Waste treatment, inert waste, at landfill {AU}| | AusLCI, U 0.0951 kg (2,1,1,1,1,5); as ecoinvent process
Wastewater from concrete production {RoW}| market for wastewater from concrete production | Cut-off, U 0.0143 m3 (2,1,1,1,1,5); as ecoinvent process

Parameters

NameValueFormulaDescription
sg_concrete 2367.951781410877 m_concrete/1 kg/m3
fr_sand 0.35 — fraction of sand in total fine + coarse aggregate
sg_cement 3.15 — http://www.engineeringcivil.com/theory/concrete-engineering/mix-design/page/3
vol_cement 0.09846222222222221 m_cement/sg_cement/1000 cum
sg_flyash 2.8 — http://www.boralna.com/flyash/faq.asp
m_water 173.86459199999996 (m_cement+m_slag+m_flyash)*wc_ratio kg
m_sand 588.5062444521074 (vol_aggre*fr_sand*sg_sand*1000) kg
fr_gravel 0.65 — fraction of aggreagte in total fine + coarse aggregate
RecAggFrac — — Fraction of Aggregate which is from recycled sources.
vol_admix 0.002508 m_admix/sg_admix/1000 cum
wc_ratio 0.36 — water reuirement is assumed to be 5% less with use of SCM
m_gravel 1136.6577749989274 (vol_aggre*fr_gravel*sg_gravel*1000) kg
vol_water 0.17386459199999996 m_water/sg_water/1000 cum
km_cementitious 150.0 — from cement plant to concrete batching plant
fr_admix 0.006 — % of admixtures by mass of cementitious material
tkm_sand 29.631289408163603 m_sand*km_sand/1000*(1+fr_waste) t-km
tkm_gravel 57.23071897119599 m_gravel*km_gravel/1000*(1+fr_waste) t-km
fr_waste 0.007 — fraction of waste generated at batching plant, as per ecoinvent
fr_flyash — — % of cementitious material
m_cementitious 440.0 — as per GBCA
m_slag 172.80119999999997 (fr_slag*m_cementitious*rep_rate)*(1+fr_waste) kg
m_flyash — (fr_flyash*m_cementitious*rep_rate)*(1+fr_waste) kg
sg_water 1.0 — —
vol_flyash — m_flyash/sg_flyash/1000 cum
sg_sand 2.5 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
tkm_cementitious 66.46199999999999 m_cementitious*km_cementitious/1000*(1+fr_waste) t-km
km_gravel 50.0 — from quarry to concrete batching plant
m_cement 310.15599999999995 m_cementitious*(1-(fr_slag+fr_flyash))*(1+fr_waste) —
m_concrete 2367.951781410877 (m_cement+m_sand+m_gravel+m_flyash+m_slag+m_admix+m_water)*(1-fr_waste) kg; mass of net concrete
sg_slag 2.9 — http://www.slagcement.org/Sustainability/pdf/No2_Proportioning.pdf
fr_slag 0.3 — % of cementitious material
vol_slag 0.059586620689655166 m_slag/sg_slag/1000 cum
sg_admix 1.06 — file:///C:/Users/Timothy/Downloads/MENT-ECO%203Re%20-%20665%20(2).pdf
km_sand 50.0 — from quarry to concrete batching plant
sg_gravel 2.6 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
rep_rate 1.3 — Replacement factor for slag and fly ash
vol_aggre 0.6725785650881226 (1+fr_waste)-(vol_cement+vol_water+vol_admix+vol_flyash+vol_slag) cum
m_admix 2.65848 (fr_admix*m_cementitious)*(1+fr_waste) kg