Concrete 20 MPa, at batching plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete manufacturing process to produce ready-mix concrete at plant (raw material provision, raw material mixing, transportation, energy and plant use). No administration is included. Wastewater and some solid wastes are considered. No dust is accounted for. Doesn't include transporting concrete to site. Remark: The amount of cement is adopted as per GBCA Geography: Concrete batching plants in Australia Technology: The concrete production is based on ready-mix concrete production in Australia Record: Data entry by: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU Generator: Generator/publicator: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
8586d1c4-6b48-3538-ac1c-a100a003d439

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Concrete 20 MPa, at batching plant {AU}| | AusLCI, U
Sampling procedure
Average data for the Australian industry based on ecoinvent process
Creation date
27 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Green Building Council Australia (2012)

Product outputs

Flow AmountUnitComment
Concrete 20 MPa, at batching plant {AU}| | AusLCI, U 1.0 m3 AUSTRALIA

Technical inputs

Flow AmountUnitComment
Concrete mixing factory {GLO}| market for concrete mixing factory | Cut-off, U 0.000000457 Item(s) (2,1,1,1,1,5); as ecoinvent process
Diesel, burned in building machine {GLO}| market for diesel, burned in building machine | Cut-off, U 22.7 MJ (2,1,1,2,1,5); as ecoinvent process
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 4.36 kWh (2,1,1,1,1,5); as ecoinvent process
Fly ash, delivered to plant {AU}| | AusLCI, U 0.0 kg —
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 1309.5733123777777 kg (4,1,1,3,1,5)
Ground granulated blast furnace slag, at cement plant {AU}| | AusLCI, U 0.0 kg —
Heat, district or industrial, other than natural gas {RoW}| heat production, heavy fuel oil, at industrial furnace 1MW | Cut-off, U 3.09 MJ (2,1,1,1,1,5); as ecoinvent process
Heat, district or industrial, other than natural gas {RoW}| heat production, light fuel oil, at industrial furnace 1MW | Cut-off, U 13.3 MJ (2,1,1,1,1,5); as ecoinvent process
Lubricating oil {RoW}| market for lubricating oil | Cut-off, U 0.0119 kg (2,1,1,2,1,5); as ecoinvent process
Melamine formaldehyde resin {RoW}| market for melamine formaldehyde resin | Cut-off, U 0.0 kg —
Natural gas, burned in tangential fired boiler {AU}| | AusLCI, U 1.16 MJ (2,1,1,2,1,5); as ecoinvent process
Ordinary portland cement, Australian average {AU}| | AusLCI, U 281.96 kg (1,1,1,1,1,5)
Recycled aggregate, at plant {AU}| | AusLCI, U 0.0 kg (4,1,1,3,1,5)
Sand {RoW}| market for sand | Cut-off, U 678.0335197222222 kg (4,1,1,3,1,5)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.0238 kg (2,1,1,2,1,5); as ecoinvent process
Synthetic rubber {GLO}| market for synthetic rubber | Cut-off, U 0.00713 kg (2,1,1,2,1,5); as ecoinvent process
Tap water, at user, Australia {AU}| | AusLCI, U 140.98 kg (4,1,1,3,1,5)
Transport, truck, 40t load {AU}| | AusLCI, U 65.9370162782211 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 34.13898771801389 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 42.294 t*km (2,1,1,2,1,5);

Outputs to treatment

Flow AmountUnitComment
Waste concrete {RoW}| treatment of waste concrete, inert material landfill | Cut-off, U 16.9 kg (2,1,1,1,1,5); as ecoinvent process
Waste treatment, inert waste, at landfill {AU}| | AusLCI, U 0.0951 kg (2,1,1,1,1,5); as ecoinvent process
Wastewater from concrete production {RoW}| market for wastewater from concrete production | Cut-off, U 0.0143 m3 (2,1,1,1,1,5); as ecoinvent process

Parameters

NameValueFormulaDescription
sg_admix 1.06 — file:///C:/Users/Timothy/Downloads/MENT-ECO%203Re%20-%20665%20(2).pdf
km_cementitious 150.0 — from cement plant to concrete batching plant
km_sand 50.0 — from quarry to concrete batching plant
sg_flyash 2.8 — http://www.boralna.com/flyash/faq.asp
sg_water 1.0 — —
fr_waste 0.007 — fraction of waste generated at batching plant, as per ecoinvent
fr_flyash — — % of cementitious material
vol_aggre 0.7695088888888889 1-(vol_cement+vol_water+vol_admix+vol_flyash+vol_slag) cum
fr_sand 0.35 — fraction of sand in total fine + coarse aggregate
tkm_sand 34.13898771801389 m_sand*km_sand/1000*(1+fr_waste) t-km
wc_ratio 0.5 — —
vol_water 0.14098 m_water/sg_water/1000 cum
m_gravel 1309.5733123777777 (vol_aggre*fr_gravel*sg_gravel*1000)*(1+fr_waste) kg
m_sand 678.0335197222222 (vol_aggre*fr_sand*sg_sand*1000)*(1+fr_waste) kg
m_cement 281.96 (m_cementitious-(m_slag+m_flyash))*(1+fr_waste) kg
vol_flyash — m_flyash/sg_flyash/1000 cum
m_admix — (fr_admix*m_cementitious)*(1+fr_waste) kg
m_slag — (fr_slag*m_cementitious)*(1+fr_waste) kg
m_water 140.98 (m_cementitious*wc_ratio)*(1+fr_waste) kg
sg_slag 2.9 — http://www.slagcement.org/Sustainability/pdf/No2_Proportioning.pdf
tkm_cementitious 42.294 m_cementitious*km_cementitious/1000*(1+fr_waste) t-km
vol_admix — m_admix/sg_admix/1000 cum
sg_gravel 2.6 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
RecAggFrac — — Fraction of Aggregate which is from recycled sources.
m_cementitious 280.0 — as per GBCA
fr_slag — — % of cementitious material
m_concrete 2393.6730042752997 (m_cement+m_sand+m_gravel+m_flyash+m_slag+m_admix+m_water)*(1-fr_waste) kg; mass of net concrete
tkm_gravel 65.9370162782211 m_gravel*km_gravel/1000*(1+fr_waste) t-km
vol_slag — m_slag/sg_slag/1000 cum
fr_admix — — % of admixtures by mass of cementitious material
sg_sand 2.5 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
sg_cement 3.15 — http://www.engineeringcivil.com/theory/concrete-engineering/mix-design/page/3
km_gravel 50.0 — from quarry to concrete batching plant
m_flyash — (fr_flyash*m_cementitious)*(1+fr_waste) kg
sg_concrete 2393.6730042752997 m_concrete/1 kg/m3
fr_gravel 0.65 — fraction of aggreagte in total fine + coarse aggregate
vol_cement 0.08951111111111111 m_cement/sg_cement/1000 cum