Lignite, Victoria, at mine {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the inputs mine construction, energy use in coal production and pulverisation. Remark: Inventory for brown coal (lignite) production in SA for the year 2007-08. The brown coal energy content is taken as 14.5 MJ per kg; Geography: Victoria Australia Technology: Current Version: 0.9 Energy values: 10.1MJ/kg Record: Data entry by: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU Generator: Generator/publicator: Tim Grant Telephone: 0061 408104977; E-mail: tim@lifecycles.com.au; Company: LCS; Country: AU

Sector
Fuels
Contributor
—
Last updated
12 Oct 2026
Reference ID
7f54688b-2fb0-3960-85f2-05ff158b8b53

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Lignite, Victoria, at mine {AU}| | AusLCI, U
Sampling procedure
Data were collected from national reporting on coal production and fuel use from National Greenhouse Gas Inventory (NGGI)
Creation date
04 Jul 2013
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Energy Gas Australia 2018/2018/Australian Energy Council.

Product outputs

Flow AmountUnitComment
Lignite, Victoria, at mine {AU}| | AusLCI, U 1000.0 kg —

Technical inputs

Flow AmountUnitComment
Electricity, brown coal Vic, at power plant {AU}| | AusLCI, U 1.2091589999999999 kWh —
Lignite dust factory {GLO}| market for lignite dust factory | Cut-off, U 0.00000001 Item(s) (1,5,1,3,1,na)
Mine infrastructure, open cast, lignite {GLO}| market for mine infrastructure, open cast, lignite | Cut-off, U 0.00000001 Item(s) (1,5,1,3,1,na)

Elementary flow inputs

Flow Sub-compartment AmountUnitComment
Coal, brown, 10.0 MJ per kg, in ground in ground 1020.0 kg Mass of elementary flow is adjusted to get correct energy content.
Occupation, mineral extraction site land 0.022222222222222223 m2*a Based on mine area used each year
Transformation, from mineral extraction site land 0.0007407407407407408 m2 Rehabilitation of mine. Based on 30 years occupation.
Transformation, from unspecified land 0.0007407407407407408 m2 Based on 30 years occupation
Transformation, to mineral extraction site land 0.0007407407407407408 m2 Based on 30 years occupation
Transformation, to shrub land, sclerophyllous land 0.0007407407407407408 m2 Rehabilitation of mine. Based on 30 years occupation.

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
Methane Emission to airunspecified 0.033 kg From NGGIC

Parameters

NameValueFormulaDescription
Depthseam 50.0 — (4,1,1,1,1,3)
OC_CH4_EF 0.033 — (1,1,1,2,1,na) kg CH4 per t coal 0.0007 t CO2e per t coal for sa
El_coal_extract 1.2091589999999999 NGAF_Adjust*El_coal_extractALCI*NGAF —
Mine_Life 30.0 — (4,3,5,5,na,5)
Mine_area 0.022222222222222223 (1000/D_lignite)/Depthseam —
NGAF 1.0 — Forces database to be NGA factor compliant for electricity and energy from different fuel types. Not currently compliant with liquid fossil fuel scope 3 emissions
NGAF_Adjust 1.0161 — —
D_lignite 900.0 — (4,5,5,5,4,5)Typical density wet lignite kg/m3
ED_lignite 10.2 — (1,1,1,1,1,na), [MJ/kg] LHV for lingite Victoria, average. Inferred from ESAA 2012 - data 2010 table 2.7
El_coal_extractALCI 1.19 — (1,3,1,2,1,4), kWH/t coal. Based on NGA factors 2013