Concrete 50 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete manufacturing process to produce ready-mix concrete at plant (raw material provision, raw material mixing, transportation, energy and plant use). No administration is included. Wastewater and some solid wastes are considered. No dust is accounted for. Doesn't include transporting concrete to site. Remark: The amount of cement is adopted as per GBCA Geography: Concrete batching plants in Australia Technology: The concrete production is based on ready-mix concrete production in Australia Record: Data entry by: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU Generator: Generator/publicator: Bharat Sharma Telephone: +61 449 787 612; E-mail: brett@lifecycles.com.au; Company: Lifecycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
3f29ebcb-7b0d-3959-bbd6-dfa77129718d

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Concrete 50 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U
Sampling procedure
Average data for the Australian industry based on ecoinvent process
Creation date
27 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Green Building Council Australia (2012)

Product outputs

Flow AmountUnitComment
Concrete 50 MPa 30% GGBFS, at batching plant {AU}| | AusLCI, U 1.0 m3 AUSTRALIA

Technical inputs

Flow AmountUnitComment
Concrete mixing factory {GLO}| market for concrete mixing factory | Cut-off, U 0.000000457 Item(s) (2,1,1,1,1,5); as ecoinvent process
Diesel, burned in building machine {GLO}| market for diesel, burned in building machine | Cut-off, U 22.7 MJ (2,1,1,2,1,5); as ecoinvent process
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 4.36 kWh (2,1,1,1,1,5); as ecoinvent process
Fly ash, delivered to plant {AU}| | AusLCI, U 0.0 kg —
Gravel, crushed {RoW}| market for gravel, crushed | Cut-off, U 1051.281393848659 kg (4,1,1,3,1,5)
Ground granulated blast furnace slag, at cement plant {AU}| | AusLCI, U 216.00149999999996 kg —
Heat, district or industrial, other than natural gas {RoW}| heat production, heavy fuel oil, at industrial furnace 1MW | Cut-off, U 3.09 MJ (2,1,1,1,1,5); as ecoinvent process
Heat, district or industrial, other than natural gas {RoW}| heat production, light fuel oil, at industrial furnace 1MW | Cut-off, U 13.3 MJ (2,1,1,1,1,5); as ecoinvent process
Lubricating oil {RoW}| market for lubricating oil | Cut-off, U 0.0119 kg (2,1,1,2,1,5); as ecoinvent process
Melamine formaldehyde resin {RoW}| market for melamine formaldehyde resin | Cut-off, U 6.646199999999999 kg —
Natural gas, burned in tangential fired boiler {AU}| | AusLCI, U 1.16 MJ (2,1,1,2,1,5); as ecoinvent process
Ordinary portland cement, Australian average {AU}| | AusLCI, U 387.69499999999994 kg (1,1,1,1,1,5)
Recycled aggregate, at plant {AU}| | AusLCI, U 0.0 kg (4,1,1,3,1,5)
Sand {RoW}| market for sand | Cut-off, U 544.302496815134 kg (4,1,1,3,1,5)
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.0238 kg (2,1,1,2,1,5); as ecoinvent process
Synthetic rubber {GLO}| market for synthetic rubber | Cut-off, U 0.00713 kg (2,1,1,2,1,5); as ecoinvent process
Tap water, at user, Australia {AU}| | AusLCI, U 181.10894999999996 kg (4,1,1,3,1,5)
Transport, truck, 40t load {AU}| | AusLCI, U 52.932018180279975 t*km (2,1,1,1,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 83.07749999999999 t*km (2,1,1,2,1,5);
Transport, truck, 40t load {AU}| | AusLCI, U 27.40563071464199 t*km (2,1,1,1,1,5);

Outputs to treatment

Flow AmountUnitComment
Waste concrete {RoW}| treatment of waste concrete, inert material landfill | Cut-off, U 16.9 kg (2,1,1,1,1,5); as ecoinvent process
Waste treatment, inert waste, at landfill {AU}| | AusLCI, U 0.0951 kg (2,1,1,1,1,5); as ecoinvent process
Wastewater from concrete production {RoW}| market for wastewater from concrete production | Cut-off, U 0.0143 m3 (2,1,1,1,1,5); as ecoinvent process

Parameters

NameValueFormulaDescription
km_gravel 50.0 — from quarry to concrete batching plant
m_gravel 1051.281393848659 (vol_aggre*fr_gravel*sg_gravel*1000) kg
m_sand 544.302496815134 (vol_aggre*fr_sand*sg_sand*1000) kg
m_cementitious 550.0 — as per GBCA
sg_admix 1.06 — file:///C:/Users/Timothy/Downloads/MENT-ECO%203Re%20-%20665%20(2).pdf
sg_water 1.0 — —
m_flyash — (fr_flyash*m_cementitious*rep_rate)*(1+fr_waste) kg
fr_flyash — — % of cementitious material
sg_gravel 2.6 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
vol_admix 0.0062699999999999995 m_admix/sg_admix/1000 cum
fr_waste 0.007 — fraction of waste generated at batching plant, as per ecoinvent
km_sand 50.0 — from quarry to concrete batching plant
vol_water 0.18110894999999996 m_water/sg_water/1000 cum
fr_sand 0.35 — fraction of sand in total fine + coarse aggregate
RecAggFrac — — Fraction of Aggregate which is from recycled sources.
km_cementitious 150.0 — from cement plant to concrete batching plant
wc_ratio 0.3 — water reuirement is assumed to be 5% less with use of SCM
m_admix 6.646199999999999 (fr_admix*m_cementitious)*(1+fr_waste) kg
m_water 181.10894999999996 (m_cement+m_slag+m_flyash)*wc_ratio kg
sg_sand 2.5 — http://www.engineeringcivil.com/m-35-mix-designs-as-per-is-10262-2009.html
vol_slag 0.07448327586206895 m_slag/sg_slag/1000 cum
sg_slag 2.9 — http://www.slagcement.org/Sustainability/pdf/No2_Proportioning.pdf
fr_slag 0.3 — % of cementitious material
sg_flyash 2.8 — http://www.boralna.com/flyash/faq.asp
sg_cement 3.15 — http://www.engineeringcivil.com/theory/concrete-engineering/mix-design/page/3
tkm_cementitious 83.07749999999999 m_cementitious*km_cementitious/1000*(1+fr_waste) t-km
m_cement 387.69499999999994 m_cementitious*(1-(fr_slag+fr_flyash))*(1+fr_waste) —
vol_cement 0.12307777777777776 m_cement/sg_cement/1000 cum
vol_aggre 0.6220599963601532 (1+fr_waste)-(vol_cement+vol_water+vol_admix+vol_flyash+vol_slag) cum
sg_concrete 2370.326291879146 m_concrete/1 kg/m3
vol_flyash — m_flyash/sg_flyash/1000 cum
fr_gravel 0.65 — fraction of aggreagte in total fine + coarse aggregate
tkm_gravel 52.932018180279975 m_gravel*km_gravel/1000*(1+fr_waste) t-km
rep_rate 1.3 — Replacement factor for slag and fly ash
m_slag 216.00149999999996 (fr_slag*m_cementitious*rep_rate)*(1+fr_waste) kg
fr_admix 0.012 — % of admixtures by mass of cementitious material
tkm_sand 27.40563071464199 m_sand*km_sand/1000*(1+fr_waste) t-km
m_concrete 2370.326291879146 (m_cement+m_sand+m_gravel+m_flyash+m_slag+m_admix+m_water)*(1-fr_waste) kg; mass of net concrete