Ordinary portland cement, at plant {AU}| | AusLCI, U

Unit process Australia v00.00.001

Included processes: Includes the complete process to produce cement from clinker(raw material provision, raw material mixing, energy and plant use). Packaging is not included. Remark: The amount of raw materials is based on the Cement Industry Federation report. Geography: Cement plants in Australia Technology: The cement production is based on dry kiln technology in raw meal is heated in a kiln to form clinker. Cement is produced by grinding clinker with gypsum. Production volume: 8.6 MT in 2012-13 Record: Data entry by: Bharat Sharma Telephone: +61 394171190; E-mail: brett@lifecycles.com.au; Company: Life Cycle Strategies; Country: AU Generator: Data entry by: Bharat Sharma Telephone: +61 394171190; E-mail: brett@lifecycles.com.au; Company: Life Cycle Strategies; Country: AU

Sector
Construction
Contributor
—
Last updated
12 Oct 2026
Reference ID
2404c1a8-8dc4-3c96-b97d-cc0dcf81a57f

Download this dataset Ask a question about this dataset

Downloads require a free account. You'll be asked to register or sign in.

Documentation

Quantitative reference
Ordinary portland cement, at plant {AU}| | AusLCI, U
Sampling procedure
Sampling procedure: most data measured by all Swiss plants (8 plants)
Creation date
13 Mar 2015
Is copyright protected
No
Is infrastructure process
No
Tags
material
Sources
Cement Industry Federation

Product outputs

Flow AmountUnitComment
Ordinary portland cement, at plant {AU}| | AusLCI, U 1.0 kg AUSTRALIA

Technical inputs

Flow AmountUnitComment
Cement factory {GLO}| market for cement factory | Cut-off, U 0.0000000000536 Item(s) (2,1,1,1,1,5);
Clinker, at plant {AU}| | AusLCI, U 0.95 kg (2,1,1,1,1,5);
Electricity, low voltage {AU}| market for electricity, low voltage | AusLCI, U 0.03762 kWh (2,1,1,1,1,5);
Gypsum, mineral {RoW}| market for gypsum, mineral | Cut-off, U 0.05 kg "(2,1,1,1,1,5); OPC contains 5% gypsum; Source: CIF2005
Steel, low-alloyed {GLO}| market for steel, low-alloyed | Cut-off, U 0.00004 kg (2,1,1,2,1,5);

Elementary flow outputs

Flow CompartmentSub-compartment AmountUnitComment
Heat, waste Emission to airlow population density 0.103 MJ (2,1,1,2,1,5);

Parameters

NameValueFormulaDescription
fr_cement 0.95 — Ordinary portaland cement contains 95% clinker, source: CIF
ED_electricitycement 99.0 — 99 kwh/t of electrical energy is used in making cement
ED_electricity 0.03762 ED_electricitycement*fr_electricity/1000 —
m_gypsum 0.05 fr_gypsum*1 —
fr_gypsum 0.05 — Ordinary portaland cement contains 5% gypsum, source: CIF
m_clinker 0.95 fr_cement*1 —
fr_electricity 0.38 — (1,5,1,3,2,5); 38% of electrical energy is consumed in production of cement from clinker as per the study, A critical review on energy use and savings in the cement industry by Madlool and collegues.